Proposal: Demand Growth SPE, Builder Pilot

Author: Rich O’Grady, Livepeer Foundation
SPE Term: December 2026 to March 2027
Budget: $145k ceiling (working)
Date: 3 Nov 2026
Community Discussion: Roadmap Session 1, Roadmap Session 2, Discord Thread

Abstract

The Network Engineering SPE is building a second door to the network alongside the Livepeer Agent: an open, self-sovereign builder stack that developers can build on. This four-month pilot, running from December 2026 to March 2027, opens that door to startups, teams and builders. Its goal is at least 5 teams putting considerable demand through the network, each more than $1,000 in fees and credits by March. A rolling programme that onboards 30 teams is how we find them, backed by $50k of credits, hands-on onboarding, a simple walletless way in built with the Network Engineering SPE, and a $15k retroactive grant pool for the projects that show results. By the end of March, we will know which builders find real value in the network today, and in what. That evidence becomes the roadmap for the next SPE.

Mission

This SPE exists to answer one question: will developers pay to build applications on the Livepeer network, and what value do they get from it that they can’t get elsewhere?

It answers it by putting the network in front of real startups and developers, with a simple way in, credits to start and hands-on support, and seeing who stays and pays.

The answer matters because independent demand is what will sustain Livepeer for the future, and it tells the community where to invest next.

Rationale

Why this SPE?

In the vision for Livepeer 2.0, the Livepeer network was described as the open inference network: purpose-built for AI video workloads, designed for the agentic era. With the changes in A Path to Livepeer 2.0, its orchestrators will:

  • serve open models locally;
  • connect APIs;
  • provide compute;
  • run media capabilities that don’t need a GPU, such as layering audio, clipping, captions, resolution changes, overlays and object-aware augmentation.

Livepeer Inc’s Agent is one door to the network. It’s built for creators who generate, edit and augment video inside the agent they already use.

Another door is being built by the Build Track of the Network Engineering SPE. Its self-sovereign open builder stack is a shared, open-source engine that handles what every application needs (finding capabilities, checking prices, running jobs and tracking cost) through an HTTP API and MCP interface. Teams can run it themselves or use a hosted option, without holding crypto, on infrastructure they can run themselves.

With a second door opening, the question is who walks through it, and why. We don’t yet know who will build on the network and pay for it outside the Agent: whether for cost, the breadth of models and media capabilities, openness, or something not yet named. None of these has been tested with independent startups or developers. Without payment abstraction, meaningful outreach to new customers isn’t possible. Building on a new network costs time and money before customers pay, orchestrators can’t see demand coming, and on an open network the numbers are hard to trust.

How this SPE will test it

  1. Get 5 teams putting considerable demand through the network. The goal is at least 5 teams each putting more than $1,000 in fees and credits through the network by March. Support is concentrated on the teams with the most demand: priority onboarding, credits up to the top tier and the capabilities their workloads need.
  2. Run a programme to find them. From January, projects join each month and are onboarded hands-on with credits. Onboarding 30 teams is a means to an end: a funnel wide enough to find the 5 that go deep. The rules will be set in December.
  3. Find teams building in video and media. Focused outreach finds individuals and teams who need compute for video and media work, with a focus on builders new to Livepeer, and brings them into the programme.
  4. Reward results, not pitches. A $15k retroactive grant pool goes to projects that have already put real usage through the network, selected by an Orchestrator Panel of five. There are no upfront cash grants.
  5. Give projects a simple way in. Built with the Network Engineering SPE and a clear onboarding surface where builders or their agents get an API key and make a first call within 5 minutes, with or without a wallet, with tested docs and public dashboards (exact product decisions are made in December.)
  6. Fund usage with up to $50k of credits. Credits are released when a project is admitted, up to the maximum for its tier; projects then pay a growing share. Pymthouse, rebuilt on the Build Track’s builder engine, processes payments and credits for the walletless route; projects that self-host their clearinghouse receive credits there. Every credit settles on-chain as network fees.

What we will know by the end of March

  • which builders find real value in the network today, and in what;
  • which uses turned into paying demand, and kept paying as credits tapered;
  • why builders chose the network, or left it;
  • what the network has to fix to serve them.

What this SPE leaves out

  • Upfront cash grants. Projects get credits, spent only as network fees. The only cash is retroactive, for projects that have already shown usage.
  • Building the product. The builder engine, onboarding surface, docs and dashboards are built and supported by the Network Engineering SPE.
  • Running capacity. This SPE funds demand-led capacity but doesn’t run it. The Operate Track manages supply and capacity: it spends only when a programme customer needs GPUs.
  • A single official route. A console will be the the easiest way in, not the only one; projects can self-host their clearinghouse or use the network permissionlessly.
  • Picking winners. Many projects try the network; retroactive grants and the evidence decide what is worth backing next.

SPE Governance Structure

Tracks

The pilot runs on three tracks. Each track has its own KPI, all pointing to the same goal: 5 teams each putting more than $1,000 through the network by March:

Track Funded and led by What it covers KPI
Programme Management This SPE: $30k; selected by RFP Runs the programme day to day: finding teams, onboarding, and driving awareness, concentrating support and credits on the teams with the most demand, feeding capacity needs to the Operate Track, case studies and monthly reporting 5 teams each putting more than $1,000 through the network; 30 teams onboarded as the pipeline
Build Track Network Engineering SPE; led by Mike Stewards the credits platform and onboarding infrastructure: payment abstraction, the onboarding surface, product decisions in December, docs, dashboards and the credits ledger, and hands-on technical integration. Links what the network runs to something companies can use. Onboarding surface live by 15 January; sign-up to first call in 5 minutes.
Operate Track Network Engineering SPE; led by Josh Orchestrators and supply. Under a new allocator design, orchestrators can dedicate GPUs to specific demand. Keeps orchestrator docs and onboarding simple, runs the orchestrator feedback loop, and provides demand-led capacity. Growth-focused rather than engineering-focused. Supply matched to each programme customer’s demand

Alongside the tracks, there will be two additional functions within the SPE:

SPE Lead. Seeks the mandate from the community, holds the track owners accountable, and selects the Orchestrator panel and the RFP. Currently overseen by Rich O’Grady at the Livepeer FOundation.

Orchestrator Panel. Five orchestrators who select the $15k of retroactive grants and guide the decision on the RFP.

Who this SPE works with

  • Network Engineering SPE. Funds and runs the Build Track and the Operate Track, which deliver the programme’s product and supply.
  • Pymthouse. The payment and credits processor that runs the console and the walletless route. It holds only the credits released to it for projects on that route.
  • Livepeer Foundation. Stewards the SPE’s treasury and contracts Pymthouse.

Decision rights

Decision Who proposes Who reviews Consulted
Programme rules, credit tiers, maximum and taper Programme Management SPE Lead Pymthouse
Admit a project to the programme Programme Management SPE Lead Build Track
Release credits to clearinghouse Build track SPE Lead Foundation
Demand-led capacity Programme Management Operate Track SPE Lead
Builder experience: scope and priorities Build Track SPE Lead Programme Management
Orchestrator Panel members Orchestrator Panel SPE Lead Orchestrator community
Retroactive grants Eligible projects Orchestrator Panel Programme Management

Milestones and timeline

December

  • Programme Management: RFP drafted, posted and winning application selected; programme rules and credit tiers published; Panel of five Orchestrators confirmed; target teams identified.
  • Build Track: Pymthouse contracted; product decisions made; Builder page drafted.
  • Operate Track: orchestrator docs and onboarding updated.

January

  • Programme Management: 10 teams onboarded; credits released as projects are admitted; first monthly report.
  • Build Track: onboarding surface live by 15 January; docs tested; first projects live.
  • Operate Track: capacity plan for the first programme customers.

February

  • Programme Management: 20 teams onboarded; first teams past $1,000; mid-point review.
  • Build Track: dashboards and credits ledger live; blockers triaged into fixes.
  • Operate Track: orchestrators dedicating GPUs to programme demand through the allocator (exact details tbd).

March

  • Programme Management: 5 teams over $1,000; 30 teams onboarded; retroactive grants selected. The SPE Lead completes the value proposition review and roadmap by the end of March.
  • Build Track: all projects live within 14 days; docs and dashboards updated.
  • Operate Track: plan to hand demand-led capacity to orchestrators.

Where this pilot is most likely to break

Some risks and mitigations that the SPE needs to be indful of:

  1. The Network Engineering SPE renewal doesn’t fund the Build and Operate Tracks’ programme work.
    Both are committed in its December renewal before this SPE’s vote. If that slips, then the remaining funds in the Network Engineering SPE will be dedicated purely to the Operate and Build tracks.

  2. Payment abstraction isn’t ready and fees can’t be told apart from credits.
    Pymthouse is part of the January readiness check; fiat and KYC compliance can follow later. Every clearinghouse that receives credits reports paid and credit-funded fees separately each month: Pymthouse directly, and self-hosted projects as a condition of receiving credits.

  3. Network isn’t ready.
    The onboarding surface and Pymthouse depend on the Build Track’s builder engine and runtime being ready for 1 January, and on enough capabilities being live to build on, including those the Agent brings online and Mike’s BlueClaw workloads. There will be a readiness check with the Network Engineering SPE and the programme starts only when it is passed.

  4. Too few teams go deep or hit problems and leave.
    Outreach aimed at teams with real compute needs in video and media, a funnel of 30 teams, and support concentrated on those with the most demand. Also have hands-on onboarding from the Build Track, the capacity they need from the Operate Track, and weekly priorities that turn blockers into fixes.

  5. Conflicts of interest between SPE members and builders
    Conflicts are disclosed, and admissions and credit releases are published in the monthly report.

  6. Credits are spent without real usage.
    Credits released per admitted project, a maximum per tier, a taper, a published definition of “active”, abuse controls and on-chain settlement.

Budget Breakdown

Total: $145k from December 2026 to March 2027, requested at the 30-day moving average LPT price.

Line What it covers Amount
Programme Management Finding teams and running the programme, December to March; selected by RFP. $30,000
Credits* Released to clearinghouses as projects are admitted, up to a maximum per project. $50,000
Pymthouse operation Running payments and credits processing for the walletless route. $10,000
Demand-led capacity Spent only when a programme customer needs GPUs, through the Operate Track: temporary, open and handed to orchestrators once demand is proven. Exact shape is tbd $20,000
Retroactive grants Selected by the Orchestrator Panel for projects that have shown usage. $15,000
Contributor Fund Working with additional contributors where necessary, released by the SPE Lead. $20,000
Total $145,000

Funded by the Network Engineering SPE: the Build Track and the Operate Track, as part of its December renewal.

Treasury and custody. The SPE’s treasury is stewarded by the Livepeer Foundation, which holds and releases funds against the budget.

Credits management. Credits stay in the SPE treasury until released. Any not spent roll over to the next SPE. When a project is admitted, credits are released to its clearinghouse up to the maximum for its tier, then topped up against usage on an established cadence. Pymthouse receives only what the walletless route needs.

Measuring Success

Deliverables

  1. At least 5 teams each putting more than $1,000 in fees and credits through the network.
  2. A rolling programme with published rules and 30 teams onboarded as the pipeline.
  3. At least $10k of retroactive grants selected by the Orchestrator Panel.
  4. At least $20k of credits released to clearinghouses as projects are admitted, with Pymthouse processing the walletless route.
  5. A review of the network’s value proposition, projects worth exploring next, and a roadmap for the next SPE.

KPIs, as evidence for the review

  • Traction: 5 teams each putting more than $1,000 through the network (Programme Management). This is the headline measure.
  • Demand: $5k in fees paid by projects themselves (net of credits), with a stretch goal of $10k.
  • Pipeline: 30 teams onboarded to the programme (Programme Management).
  • Network Engineering SPE commitments: onboarding surface live latest by 15 January with the ability to match demand with supply.

Transparency and Accountability

  • Programme rules published in December, including what counts as an “active” project.
  • Monthly report and forum post: projects, usage, credits released and spent, fees net of credits, and progress for each track.
  • Public dashboard and credits ledger, updated weekly, with data from Pymthouse and self-hosted projects’ reporting.
  • Retroactive grant decisions published with reasoning; Panel members step aside on any project they have a stake in.

Key Terms

Builder. A startup, team or developer building on the Livepeer network.

Onboarding surface. The console, docs and Builder page where builders or their agents get an API key and go.

Clearinghouse. The service that handles payments and holds released credits for a project: Pymthouse, or the project’s own.

Pymthouse. The hosted clearinghouse: payment and credits processor that runs the walletless route.

Active project. A project putting credits through the network each week, as defined in the programme rules.

Retroactive grant. Cash awarded after a project has shown real usage, never upfront.

Network fees net of credits. Fees projects actually pay themselves, excluding the share covered by credits.

Open questions

  • Network Engineering SPE renewal: funding and scope for the Build and Operate Tracks’ programme work, agreed before this SPE’s vote.
  • Product decisions: the scope and priorities of the builder experience on the website and Pymthouse, made in December.
  • Readiness check: what level of network readiness must be live for the programme to start.
  • Programme rules: tiers, maximum per project, taper and the definition of “active”, set in December.
  • People: Programme Management selected by RFP in late November or early December; and who sits on the Orchestrator Panel.

Thank you, and over to you

This pre-proposal has been shaped by many people: those who joined the roadmap sessions, added comments in the docs and pushed back on Discord, and the contributors, orchestrators and Network Engineering SPE leads who gave their time to test the thinking. Thank you to you for all your work.

Before it goes to a vote, I’d welcome detailed feedback, especially on:

  1. The goal: is 5 teams each putting more than $1,000 through the network the right test of whether builders find real value here?
  2. The budget: is $145k split the right way across the tracks? And should we be asking for more or less?
  3. The tracks: are the responsibilities between this SPE and the Network Engineering SPE’s Build and Operate Tracks clear, and is anything missing?
  4. The risks: what have we missed, and are the mitigations strong enough?

Please reply in this thread, or reach out to me directly if you’d rather talk it through. The more specific the feedback, the more useful it is. Thank you in advance.

2 Likes

I consider this to be a well-constructed proposal with strong risk mitigation. Frankly, my primary concern is network readiness for builders. If this program fails to deliver, it’s likely because builders either (1) have to reinvent too much of their infra or (2) encounter stability issues that outweigh the benefit of the credit program.

Overall, I’m strongly in favor of this SPE and eager to see it passed. Consider this feedback a nudge to focus on delivering for builders.

2 Likes

I agree with Hthillman’s concern about network readiness. I think this is one of the most important factors in determining whether the pilot will produce meaningful results.

The proposal is a great step toward something Livepeer has needed for a while: measurable, independent demand.

However, I think we should be careful to distinguish between three outcomes:

  1. Builders who leave because of technical friction or reliability issues.

  2. Builders who successfully integrate Livepeer but don’t find a compelling economic or technical advantage.

  3. Builders who find real value and continue paying once their credits are reduced or exhausted.

These outcomes tell us very different things about the network’s future.

Would it make sense to include retention and post-credit usage as explicit KPIs, alongside the existing targets for onboarding and fees paid net of credits?

I believe the real success of this pilot won’t just be getting five teams to spend $1,000 each, but demonstrating that some of them genuinely want to keep building and paying on Livepeer.

That would be a particularly valuable signal for the network’s long-term sustainability.

1 Like

Thanks for the demand led capacity line that was the gap in the earlier draft.

On timing: first projects go live mid-January, but the capacity plan lands in January too and orchestrators only dedicate GPU in February…

And the bottleneck isn’t deployment drivers, containers, weights, engines, testing is a day or two. It’s sourcing the card. GPU supply is close to non existent right now, weeks or months of waiting when you can get them at all. We need to know what hardware and where, to buy or rent in December…

This is the same demand experiment with a smaller number and a bigger invoice. $145,000 to get five teams to spend $1,000 each. That’s $5,000 of “demand.” You are spending $29 for every $1 you claim to generate. At the stretch goal, $14.50. Call it a pilot if you want. It’s a salary program with a KPI attached.
The budget tells you who it’s for. $50,000 is credits. Thirty teams, so $1,667 each on average, more than the $1,000 that supposedly counts as serious demand. A team can hit the target by spending the credits you gave it. The proposal counts “fees and credits” and says every credit settles on-chain as fees. The headline can be met without one team paying a dollar of its own money.
Add the $20,000 “demand-led capacity” and $70,000 of the $145,000, or 48%, goes to orchestrators. The only cash that reaches a builder is the $15,000 retro pool. The other $80,000 is programme management, Pymthouse, capacity and a discretionary fund. This isn’t a demand strategy. It’s an AI slop funnel with a grant attached, and most of the grant goes to the supply side.
We have run this before. Transformation SPE: partnerships, MOUs, a retrospective, no retained team. Rich’s own words: “Ive seen us do the former before with the Transformation SPE and it didn’t work.” AI SPE Phase 4: three demand partners promised, onboarding “more incremental than planned,” then deferred; team rebranded MuxionLabs. Agent SPE: 30,000 LPT, split, Embody took 6,803.8 LPT and became WEAVE. WEAVE: $100,000, Dane left within days, Askuno effectively written off, deliverables deprioritized, eight hackathon registrations after 81 builders contacted. Streamplace: 100,000 LPT, thread ends with a monthly-report reminder. NE SPE: $95k then $230k, onboarding surface still due January 2027.
Six programs I can name without looking. Not one retained, self-paying team. The only thing that compounds is the grant process.
And the core stack is being rebuilt right now. Livepeer Node is replacing the legacy go-livepeer application path. Console is “reference material” for a new builder engine. Pymthouse is being rebuilt on top of that. The clearinghouse was a $15k grant in June; by October there’s a second clearinghouse codebase. That’s not a network ready for demand. It’s a construction site where the entrance keeps moving.
After three years, the answer to “why would a developer use Livepeer?” is still “because we’ll pay them.” That’s not a value proposition. That’s a coupon. Transcoding had a real answer: cheaper video processing, a deterministic job, a simple interface, a supply side that could undercut the cloud. AI has the same models, the same GPUs, and none of the reliability a buyer needs. You can’t subsidize your way out of a product problem.
The Foundation has no product thesis. It has a funding process. Every time a programme ends, a new proposal appears with the same structure, a new panel and a new dashboard. The Foundation writes the proposal, reviews the decisions, holds the treasury, contracts Pymthouse, picks the Orchestrator Panel and drafts the RFP. It is paid by the same treasury it is asking to spend. If this fails, there’s a retrospective and another proposal. If it succeeds, there’s another proposal. The people writing the proposal carry no risk. The treasury carries all of it.
So they’ll keep doing it until the LPT price makes it impossible. At $1.40, that end is getting closer. This isn’t a plan for demand. It’s a plan for the next proposal.
I’ll vote no. If you want a yes, bring one team that is still paying after the credits stop. One workload where Livepeer is cheaper or better after the subsidy. One public P&L that shows the buyer, the orchestrator and the network all make sense without inflation. Build that, and you don’t need a $145,000 pilot. You’ll have a business.
Until then, this is just another SPE asking the treasury to fund the search for a reason to exist.

1 Like

Cheers Rich, decent amount in here I actually like. Walletless onboarding, no cash upfront, a proper readiness check before anything kicks off. Right instincts. I’d love to vote yes on this. As it stands though it’s a no from me, and here’s why.

The $30k for programme management. We’re being asked to sign that off before anyone knows who’s doing the job. RFP comes after the vote, picked by the SPE Lead, who also picks the panel advising on it. Could be anyone. Name the team first, show us what they’ve done, then ask for the money.

The headline KPI. “Fees and credits” means a team hits $1,000 by spending the credits we handed them. That’s not demand, that’s us paying ourselves. The only real-money number is $5k net of credits across thirty teams, which is about $167 each. That tells us nothing.

The door doesn’t exist yet. Onboarding surface, builder engine, Pymthouse, all hanging off the Network Engineering renewal that hasn’t passed yet. And kilout’s bang on about hardware. If you want capacity in February, we’re buying cards in December, and nobody’s told us what.

The $15k retro pool. We’ve already got a Retroactive Grant Applications category on this forum with its own cap and process. Why a second one with a second panel? Send programme builders through the one that exists.

What gets me to a yes: a named programme team before the vote, a per-team net-of-credits target that survives the taper, the NE pieces live before this budget gets released, and the retro grants folded into what’s already there.

2 Likes

so it’s a Network Engineering SPE to see if “start up, teams and builders” can be incentivized to build apps that will or may have some value on the LivePeer network at some indeterminate future time. Apologize for being only an investor in LPT, not a developer, but wasn’t this SPE proposed to explore ways to increase demand for LivePeer’s services?. I thought that meant more marketing, more social media presentations, more campaigns to generate awareness of what LivePeer can do now for paying customers. Instead this SPE will have developers paying developers to develop some more code that may or may not be useful, after some more incentives (ie after LivePeer spends some more money). Is there anyone out there on the LivePeer Foundation or in the LivePeer organization who has an MBA (as opposed to a PhD in computer engineering) who can propose a more practical (ie more likely to generate near future income for LivePeer) SPE? Please cancel this proposed SPE and spend the money to generate demand, not to write more code.

Thanks for putting this together, a demand generation program is overdue. Some thoughts, many of which I’ve stated in the past:

  • 5 teams is quite modest, and $1,000 in spend is very high for projects that haven’t yet demonstrated legitimate traction. This could lead to either under-utilizatio of allocated credits, or filling the network with synthetic work just to use up the credits.

  • The implication here is also that we think we can choose winners that will bring genuine demand to the network, but that is very hard, and nobody can actually promise that.

  • Overall, this reads like a very expensive way to run a tiny cohort of builders

Suggestions

  • I’d prefer to see a focus on repeatable volume: smaller grants ($50-100) to many more projects (anyone who signs up, really). The more projects we have coming into the door, the less dependent we are on any one “home run” for demand. If anything shows real traction we can always issue them more credits; nobody should feel constrained by network spend at this point.

  • More projects using the network means builders will experiment with different things, we can learn from different angles, and it makes growth and onboarding a learned muscle for the ecosystem.

  • In fact, I’d say that developing this growth muscle should be the primary focus of the demand SPE; fees on the network are the ultimate KPI but that’s too easy to juice on its own.

On the line item budget breakdown:

  • The “program management” is fine but I think the role here really should be focused around GTM and growth. The overriding priority is to get people into the door to build on the network.

  • Builders need dedicated support and a voice. There needs to be a Dev Rel role for support, documentation, developing onboarding, etc. Part of the responsibility here should be translational: seeing what builders are doing, and carrying that over to the ecosystem development side.

  • The categories outside program management / credits are oddly miscellaneous; I’d put another $30k towards DevRel and the rest towards marketing or additional credits.

  • This should be about showing results from the development we’ve already funded, rather than funding more development.

  • GTM takes time to execute so I’d be in favor of more funds (300-400k) for longer, eg 6 months. This also helps us support the right people for the growth and DevRel roles.

Overall I think a SPE focused on growing demand is the right bet. Excited for this, regardless of which form it takes.

1 Like

I received an award and a badge today and was told “to keep up the great work” (please see the insert below), so I look forward to timely execution of the sagacious suggestion in my comment today. By the way, your badge recipient and award holder has an MBA, ha ha, just more noise for you to ignore.

Thanks Rich, this is a direction the network has needed for a while, and I’m glad to see it framed around measurable, independent demand. The walletless onboarding, no upfront cash, and a real readiness check before anything starts are all the right instincts.

A couple of thoughts from the operator side, offered constructively:

On the headline KPI, I’d love to see fees net of credits and post-credit retention carried as first-class metrics alongside the onboarding numbers. Getting five teams to spend credits we provided tells us less than seeing even one or two keep paying once the credits taper, that’s the signal that really matters for the network’s future.

On capacity and timing: sourcing GPUs is the long pole right now, and if we want dedicated capacity in February we realistically need to know what hardware and where in December. It would help orchestrators a lot to see the capacity plan land earlier in the schedule.

And I’d gently second the idea of casting a wider net, more teams with smaller credits, so we’re less dependent on any single project being a home run. Excited to see this move forward in whatever form it takes.

This is a confusing SPE, as are other SPE’s coming forward prior to Livepeer 2.0 and all the fragmented work happening on the network. This doesn’t seem like the time for another vague demand experiment and we’ve seen how this usually ends, so I have to position against it.

The reality of this being proposed before knowing who the teams are is a clear indicator of its chance at success.

On this section:

What we will know by the end of March

  • which builders find real value in the network today, and in what;
  • which uses turned into paying demand, and kept paying as credits tapered;
  • why builders chose the network, or left it;
  • what the network has to fix to serve them.

My opinion is we don’t need to wait until the end of March to be confident about any of these points. No builders from the 5 teams will find real value because the network itself is in a foundationally weak spot and isn’t remotely competitive. Sticking around after the free money runs out is an absolute gamble when we have no idea who the teams are, but based on prior initiatives, the odds are skewed in the wrong direction. We know why dev’s leave the network; no need for an SPE to figure that out.

The network needs to fix experience, vision, and usability first, then talk about it until people care or it dies. Right now, it’s not practical to utilize Livepeer, and it isn’t the time to be launching an experimental demand SPE. I also continue to be bearish on the attachment Livepeer has to video workloads and don’t think that path will end well, but at least there’s a path.

Thanks for putting this together and making the effort to communicate with the community before hand with all the DM’s, pings, and calls. I just don’t think this has the outcome one would hope for.

4 Likes

Hi all, a huge thank you to everyone for taking the time to give feedback. Appreciate the stress-testing.

Throughout this proposal writing process, Ive done my best to facilitate the discussion and synthesise the collective feedback into a representative proposal. With information asymmetry, conflicting approaches and my own biases, I knew it would be challenging and that we may not reach consensus.

After this feedback, my conclusion is: this SPE has the right direction, but there are too many unknowns in the proposal to take it to vote in its current form.

What I am hearing is there isn’t yet the evidence to justify the ask. The plan was to use the SPE to fact find, plan and then build. In current market conditions, I understand the sentiment that there needs to be more done beforehand.

So before a proposal goes live, I would suggest there are a few gates that need to be reached which aren’t there today:

  • A reliable demand-side builder stack and onboarding path. Builders shouldn’t have to rebuild infrastructure or fight stability issues to use the network (cc @hthillman, @Pon, @Authority_Null).
  • An improved Orchestrator experience to match supply to varied demand-side needs. This includes hardware decisions made early enough to actually source the capabilities - not just GPUs - (@kilout, @Wiser).
  • A selected team to run the programme and SPE, not the Foundation. The Foundation can help select the team to lead the SPE and hold it accountable but not lead itself. (cc @Pon).
  • At least 3 published case studies of paying customers on the network. Teams paying net of credits with their use cases published (cc @Sparta, @Wiser, @Karolak).

Consequently, my personal focus will shift to sprinting towards network readiness for Q1.

I will double down on the engineering work that relies on the Build and Operate tracks of the Network Engineering SPE to ensure that we have a smooth supply and demand-side experience. We are planning to extend the SPE’s runway to the end of Q1 with new priorities to ensure there is a strong experience on both the supply- and demand-side, and to support the Livepeer Agent team as much as possible.

In the meantime, I also welcome: (a) further discussion, questions or comments on this SPE whether he or in Discord; and (b) other demand growth initiatives to take these learnings and run with them e.g. the Livepeer micro-endownment (cc @DeFine).

Thanks once again to everyone involved. This has been a valuable process, and a good sense check. We keep moving forward!

5 Likes

Hi @Authority_Null,

Thanks for sharing your perspective. Your comments about Livepeer’s competitiveness, usability and the reasons developers leave the network are particularly concerning from a delegator’s point of view.

As delegators, we have very limited visibility into what developers and potential customers actually experience when trying to use Livepeer.

Would you be able to share some concrete examples or measurable data behind these concerns?

For instance:

  • What are the main technical or operational issues preventing developers from using Livepeer today?

  • Do we have any figures on failed integrations, reliability issues, or developers who have abandoned the network?

  • How does Livepeer currently compare with competing solutions in terms of cost, performance and ease of integration?

  • Are these issues specific to video workloads, or do they also affect the broader AI infrastructure being developed under WEAVE?

I’m not questioning your assessment. Quite the opposite: I think this is exactly the kind of information delegators need to make informed decisions about the network’s direction and the allocation of treasury resources.

If the network is fundamentally uncompetitive today, understanding precisely where and why seems essential before funding further demand-generation initiatives.

Thanks in advance for any insights you can share.

1 Like